Summit Industrial Construction, LLC is pleased to announce their involvement with the Gray Oak Crane Terminal Project. The scope includes construction required to install (6) large mainline booster pumps, can pumps within the tank farm, pipe racks, short run underground pipeline and all other major & ancillary equipment. This includes all site work, civil, structural, mechanical, piping, electrical and instrumentation work. This is a major terminal facility along the Gray Oak Pipeline. The project should be completed by the end of the year.