Summit was responsible for the design-assist, procurement, fabrication and installation of approximately 5,000 LF of unistrut racks within the PSSS area inside the FAB building. Included 45,000 LF of single, double and quad strut materials. Summit worked closely with other contractors so they could load the racks with their systems and Summit did final assembly and installation in the building.