Project Eagle Semiconductor Modular Assembly

Project Eagle Semiconductor Modular Assembly

This work was executed at Summit’s OSM Crosby Modular Assembly Yard. Summit’s engineering group worked with the client’s engineer to further the design from LOD 300 to LOD 450. Summit fabricated and assembled over 10,000 tons of structural steel to build over 400 truck-able modular trestles. These modules included 150,000 LF of various high purity piping systems, 15,000 pipe supports and 100,000 LF of cable tray. Summit was responsible for the logistics and delivery of all these trestles from Texas to Arizona.

ClientConfidential
LocationChandler, Arizona
WE WANT TO WORK WITH YOU
Contact Summit Industrial now.