Semiconductor Modular Assembly

Semiconductor Modular Assembly

Project scope included pre-construction activities, engineering design-assist, and pipe rack module fabrication, assembly, and heavy transportation for over 500 Trestle Modules:

  • 9,000 tons of structural steel
  • 130,000 LF pipe (carbon, low purity & high purity stainless, plastics)
  • 70,000 LF cable tray
  • 18,000 pipe supports
  • Heavy haul transport from Texas to Arizona (two day trip)

ClientConfidential
LocationChandler, Arizona