Summit’s onsite scope of work included all the civil and foundations associated with trestle structures. Included drilled piers, pier caps, plinths and grounding. Over 35,000 cubic yards of concrete was installed. Summit also received, unloaded and erected over 400 modular trestles that were shipped from Texas. Scope included all the piping interconnects, welding and testing. Summit was also responsible for the scaffolding, insulation and final coatings touch up.