Summit Awarded ONEOK EP Connect Project
Summit was awarded ONEOK’s MB4 EP Connect Project. The scope includes the fabrication and installation of one meter skid, fabrication and installation of 1,200 LF of 6″ Pipe, and make two tie-ins inside an existing facility. Summit’s scope of work…