Summit was awarded the Plain All American Wink Terminal Project. The scope includes the installation of 36” ANSI 600 Launcher, 24” ANSI 600 Receiver, six (6) meter skids, four (4) 10,000-HP pipeline pumps, a stationary prover, two (2) station sumps with pumps, Medium and Low Voltage transformers and a PDC Building.