Summit was awarded the P66 Gray Oak Central Terminal Project. The scope includes the construction required to install large mainline booster pumps, can pumps with the tank farm, pipe racks, short run underground pipeline and all other major and ancillary equipment. This includes all sitework, civil, structural, mechanical, piping, electrical and instrumentation work. This is a major terminal facility along the Gray Oak Pipeline.