Wink to Webster, Wink Terminal
Wink to Webster, Wink Terminal
The scope includes the installation of 36” ANSI 600 Launcher, 24” ANSI 600 Receiver, six meter skids, four 10,000-HP pipeline pumps, a stationary prover, two station sumps with pumps, medium- and low-voltage transformers and a PDC Building.
Client | Confidential |
Location | Wink, Texas |
WE WANT TO WORK WITH YOU
Contact Summit Industrial now.
Contact Summit Industrial now.