Morgan’s Point Terminal

Construction services include work to be performed inside the facility Tank Farm and consists of installing two 1,750 hp Mainline Booster Pumps, one new coriolis meter, a new PCR building, and various piping extensions to existing services. Also includes installation of a new 3” nitrogen line from the Tank Farm to the Dock road through existing rack and installing the secondary from the transformers to the new PCR building.

ClientEnterprise Products Partners L.P.
LocationLa Porte, Texas