Project scope includes pre-construction, engineering design-assist, excavation, procurement, pre-fabrication, and installation for all medium voltage, low voltage, and security electrical duct banks for a new 1.2 GW data center facility. This comprises 775,000 CY of excavation, 4,400,000 LF of conduit assembly and installation, and 782 EA precast electrical vaults fabrication and installation.