Phoenix Semiconductor UG Infrastructure & AG Piping
Phoenix Semiconductor UG Infrastructure & AG Piping
The scope included all labor, material, equipment, and design-assist services to provide turnkey UG electrical infrastructure including the Low & Medium Voltage duct banks for the 2 FAB buildings and the first phase utility buildings. Installations included 580,500 linear feet of 6” to 3” conduit, 167 precast concrete manholes, 7 25×25 cast-in-place manholes which made up 56,260 linear feet of duct bank.
| Client | Confidential |
| Location | Phoenix, Arizona |
WE WANT TO WORK WITH YOU
Contact Summit Industrial now.
Contact Summit Industrial now.
