Pharmaceutical Facility Pipe Rack Module Install & Interconnects

Pharmaceutical Facility Pipe Rack Module Install & Interconnects

Project scope includes pipe rack module installation, erection, and MEP systems
interconnects for a new pharmaceutical manufacturing facility in Indiana.

  • 142 modules (i.e., Shoeboxes)
  • 8 “E-Houses”
  • 1,200 tons of stick built steel erection – Both Painted and Galvanized
  • Over 8,000 welds for Carbon, Hastelloy, Duplex, and Stainless piping systems
  • Over 500 cable tray interconnects
  • Heat trace and insulation interconnects