Project scope includes pipe rack module installation, erection, and MEP systems
interconnects for a new pharmaceutical manufacturing facility in Indiana.
- 142 modules (i.e., Shoeboxes)
- 8 “E-Houses”
- 1,200 tons of stick built steel erection – Both Painted and Galvanized
- Over 8,000 welds for Carbon, Hastelloy, Duplex, and Stainless piping systems
- Over 500 cable tray interconnects
- Heat trace and insulation interconnects