April 3rd, 2018 by Summit Industrial

Summit Industrial has been awarded the contract for the installation of new facilities to increase the capability of the AEGIS Ethane Pipeline.  The scope includes the installation of two (2) each 2,750 hp Booster Pumps, tying into the existing ANSI 600, 20” AEGIS pipeline, and all necessary sitework, E&I, pipeline, and utility upgrades.