August 2nd, 2018 by Summit Industrial

Summit will begin internal design & engineering immediately for six (6) greenfield, NGL booster pump stations along Enterprise’s TX Express Pipeline System. The stations will be at locations along the TEP pipeline from Skellytown, TX through Mont Belvieu, TX. Along with engineering the contract scope includes all construction disciplines and full procurement. The projects are slated to conclude during the 2nd Quarter of 2019. Another great project for Summit Industrial with Enterprise Products.