Enterprise Products RGB Unloading Project


Client: Enterprise Products Partners, L.P.

Location: Pasadena, Texas

Scope: Installation of facilities and infrastructure necessary to unload Refinery Grade Butane (RGB) product at the client’s facility located on the Houston Ship Channel.  The project is a design/build (EPC) project constructed in close coordination with our Engineering Partner, GHD. The new facilities will allow the client to offload RGB product from barges and transfer to existing underground pipeline systems. It includes all necessary piping, including 11,000 LF of piping through existing rack systems at an operating plant, installation of large pieces of equipment that are being relocated from one facility to another, all foundations, structural steel, millwright, testing, and start up support services.

Duration: 7 Months

Contract:  Lump Sum